History
Dan rapid railway is the basis of former Eastern Railway Original northeast sun to reach the village on a modified design of the project. Design Eastern Railway northeast village before the sun to reach the speed of 160 km national railway grade Ⅰ single-line railway.
2009 Nian 4 21, the Liaoning provincial government and the former People's Republic of China Ministry of Railways signed the "Minutes of the meeting on the strengthening of Liaoning promoting railway construction," which set the speed of the railway redesigned 250 km double line electrified railway, mainly to move passengers, and cargo.
2009 Nian 6 28, the former People's Republic of China Ministry of Railways and the provincial government reported the amendments before Dan Yang fast intercity railway to reach the village to the Chinese National Development and Reform Commission.
2009 Nian December 19 to 21, the former People's Republic of China Ministry of Railways held before Dan rapid railway preliminary design review meeting sun to reach the village in Beijing, officially adopted the project preliminary design review.
2010 In March China's National Development and Reform Commission approved the adjustment programs, adjusted to Dan rapid railway speed of 200 km double line electrified railway.
2010 Nian 3 17, Dan rapid railway officially started construction.
2015 Nian 3 26, Dan rapid railway project in Dalian section of land by the former People's Republic of China Ministry of Land Resources approval.
2015 Nian 8 18, Dan rapid railway before sun to reach the village through the number of projects entered the static acceptance.
2015 Nian 10 26, Dan rapid railway into the FBI test phase.
2015 Nian 11 9, Dan rapid railway line test run.
2015 Nian 12 17, Dan rapid railway official opening and operation.
Since December 10, 2019, China Shenyang Railway Bureau Group Co., Ltd. Dan rapid railway stations along the implementation of e-ticketing service.
Line Station
Design Parameters
Line Data b> | |
design speed | 200 km / h |
track type | ballasted track, rail seamless |
railway standard | 1435 mm (standard gauge) |
minimum curve radius | is generally 3500 m; difficult 2800 m |
maximum slope | 6 ‰ |
occlusion type | automatic Block < / td> |
references: |
stations along
Dan fast railway line a total of 15 for passenger service stations, namely Dandong station, Dan things stand, the East Harbor North station, North Africa sub-station, Dagushan station, green reactor station, Zhuang Hebei station, garden mouth station, chengzitan station, Pikou station, xingshutun station, Dengshahe station, Quang Ninh Temple station, Jinzhou station, Dalian North Railway station.
ID | Stop | mileage (kilometers) | station location | affiliation |
1 | < td> 0 | Zhenxing District Dandong Pentateuch Street 2 Liaoning | China Railway Shenyang Bureau Group Co., Ltd | |
2 | Dan things stand | 22 | Tangchi town renaissance village Zhenxing District Dandong City, Liaoning Province < / td> | |
3 | East Harbor North station | 38 < / p> | Donggang City, Liaoning Province, Liu Xincheng street bubble village | |
4 < / td> | Kitai substation | 57 | Donggang City, North tOWN Liaoning Province | |
5 | Dagushan station | < p> 86 | Dandong City, Liaoning Province under the jurisdiction of Donggang City Gushan town | |
6 | Qingdui station | 119 | Liaoning Province Zhuanghe City green reactor town double lye | |
7 | Zhuang Hebei station | 147 | Zhuanghe City, Liaoning Province, Xu Zhen Yi Tun | |
8 | garden opening station | 182 | Zhuanghe City, Liaoning Province, Dalian port economic zone garden | |
9 | chengzitan station | 195 | Liaoning Province Dalian Pulandian Chengzitan town district | |
10 | Pikou station | 209 | Dalian City, Liaoning Province Pulandian District Pikou street | |
11 | xingshutun station | 234 | Jinzhou District, Dalian City, Liaoning Province, apricot street | |
12 | Dengshahe station | 243 | Jinzhou District, Dalian City, Liaoning Province Dengshahe street | |
13 | GUANGNING Temple station | 263 | Jinzhou District, Dalian City, Liaoning Province, two shilipu street | |
14 < / td> | Jinzhou station | 279 | Jinzhou District, Dalian City, Liaoning Province, in the long Street 2 | |
15 | Dalian North station | 293 | Ganjingzi District of Dalian City, Liaoning Province, North Road | |
references: |
alignments
Dan rapid railway line long 293 kilometers, located 15 sites for passenger traffic line drawn from Dalian North Railway station, the salt across the overpass, the inland port logistics park, drill simultaneously on the Shenyang-Dalian railway cross-Dalian highway, turning to the northeast station in both the Golden state, Golden state in both yards the north side of the front yard of parallel lines, then across existing railway Harbin-Dalian line to form a tunnel through Hongta industrial zone, drill both the Shenyang-Dalian railway, the railway and then continue eastbound across the highway Dan, Dengshahe, too Dengshahe station after discount to the northeast, from the north side by guojiatun, after continued northbound across the river flagpole, Liu River and the existing railway Jincheng, after the parallel existing railway had xingshutun, Dayao jiatun by entering the Jinzhou District Champlain shop area. Then continue north over the railway Dasha, cross Jincheng railway; then through the skin Yang planning area, across the river water. Then the line east to move closer to the existing line of Jincheng, Jincheng across the line, crossed into the territory of the garden Biliuhe port economic zone. Continue to the existing railway line north of the city of Trang parallel forward, the city rebuilt after the village line drill, in both the city line south of the village continue in parallel, the first line into the territory of Zhuanghe City, east Dan high-speed route along the south after the saddle Hill industrial Park North, North chestnuts, Gushan town, in the loess ridge north across the great Southern highway to Dan, the son Kitai, Donggang across State Road 201, then northeast through the same shangxingzhen reach this fold line to the southeast Dandong terminal line station.
the operations of
operator course
2015 Nian 12 17, Dan rapid railway official opening and operation. Dan rapid railway opened early, arrange open daily operations EMU trains 12 pairs, 17 pairs of freight trains CDB. Dandong to Dalian between EMU trains by Intercity-opening the line.
2017 Nian 11 15, former Shenyang Railway Bureau to adjust the part of the train operation diagram, Dan rapid railway multi EMU outage, Dalian Zhuanghe interval plus open four EMU, Dandong to Shenyang D7636 / 41 EMU peak times changed line operation.
Passenger traffic
As of December 17, 2016, Dan rapid railway opened the first anniversary of operation, a total of 4.64 million people to send visitors, average daily send visitors 12,700 people, in 2016 on October 3 the highest single-day passenger sends a record 25,000 passengers.
Equipment Facilities
vehicle facilities
Dan Rapid Railway Lines trains include CRH5 EMU trains, CRH380B EMU trains and "harmony" electric locomotive. Wherein CRH5 EMU neutral Changchun Railway Vehicles Co. production design, the vehicle high-strength, lightweight aluminum drum body section, grouping eight, five three movable trailer, traction power of 5500 kilowatts, the vehicle can be two reconnection to run for long distances, transport demand large capacity, suitable for cold areas.
Runtime
CRH5 EMU straight-computer control electro-pneumatic braking system, may be used to achieve artificial braking, emergency braking; and effectively combined with the signaling system, overspeed safety realize automatic parking guide stop function, ensuring a quick and smooth in any case stop; achieve energy feedback grid, saving energy by an electrical brake; blend braking by air to achieve a large braking force at high speed, effectively reducing brake wear plate and the gate plate.
construction achievements
technical problem
-
unique soft subgrade
Dan rapid railway to the north east of Hong Kong Zhuanghe through the western part of the coastal region are mostly alluvial plain, flat open terrain, in most places the distribution of soft soil, characterized by high water content, high void ratio, high compressibility, etc. local soft soil no hard shell, soft soil subgrade total length of 20.59 kilometers, accounting for 7.1% of the total length of the line. After many discussions and tests, soft roadbed using cement mortar in the construction of the piles, concrete piles stirring, various methods CFG pile reinforcement, reinforced concrete pipe piles and the like, including settlement observation point and set a total of 224, to ensure that soft soil roadbed ability to meet the passenger train and truck traffic.
key project
-
Ocean River Bridge
From Dandong exit station 73 km, the famous Yalu River coastal wetland national Nature. To maximize avoid damage to the natural environment protected areas, Dan rapid railway built ocean River Bridge to cross the bridge and roadbed form the outermost experimental area protected areas. Bridge construction process, the use of steel cofferdam, ban set to take spoil ground, construction sites in protected areas. At the same time, but also specifically to avoid the migratory bird breeding period and Construction year March 20 to the end of June, setting a flag Jinming, take long rail welding and other noise and vibration reduction measures, both sides of the road through the wetlands sound barrier and to install a variety of ways collision of birds and other facilities, to maximize the protection of the natural environment, reducing the impact on the survival of birds, embodies the concept of harmonious development between man and nature co-exist in symbiosis.
-
two shilipu tunnel
two shilipu tunnel located in Dalian City, Liaoning Province about 6 km northeast of Jinzhou District, a total length of 7645 meters, crossing the mountains, valleys and mountains located between low mountains, mountain undulating terrain, one of the key control Dan rapid railway projects. Two shilipu improvements in tunnel construction practices, provided the import, export, and a total of eight three inclined parallel construction excavation surface tissue, and in accordance with the level of the surrounding rock parallel step method embodiment step method and short respectively, cross-flow jobs and overcome the complex geology surrounding rock, broken rock and other difficult to ensure project quality and progress.
significance valueDan Shen Dan rapid railway through the convergence of high-speed railway, the Shenyang-Dalian railway, the formation of a "big triangle" in central and southern Liaoning railway network of the main skeleton, ending Dandong no history between Dalian and direct access to the railway, which greatly improved transportation efficiency and service levels between the two cities of Dalian and Dandong, the promotion of port economy and the rapid development of rail transport, service of the Northeast economy development will play an active role .